Site Utility Relocation (Beale St. Sewer)

Bid Type: Construction
Bid Number: TG04.6
Bid Title: Beale/Main/Howard/Mission Street Sewer & Sludge
Bid Due Date: January 14, 2011 (formerly January 7)
Time Due: 10:00 am
Engineers Estimate: $1.7 million
SBE Requirement: 100%

Description:
Webcor/Obayashi Joint Venture seeks responses to an Invitation for Bid from Trade Subcontractors for package TG04.6 – Beale, Main, Howard, Mission Streets Sewer & Sludge – on the Transbay Transit Center project in San Francisco, California. Trade Subcontractors should have significant experience with underground sewer work.

Bid Plans and Specifications may be purchased via Ford Graphics PlanWell, (415) 537-2200. Other package documents, including the Project Bidding Manual, are posted below.

A pre-bid conference for Trade Subcontractors interested in submitting bids was held on December 16, 2010 at 10:00 am, at TJPA offices, 201 Mission Street, Suite 2100, San Francisco, CA.  The pre-bid conference was optional but attendance was highly encouraged. Pre-Bid Presentation | Pre-Bid Sign-in Sheets

An additional pre-bid conference/drawing review for Trade Subcontractors interested in submitting bids was held on January 10, 2011 at 1:00 pm, at TJPA offices, 01 Mission Street, Suite 2100, San Francisco, CA. The pre-bid conference/drawing review was optional but attendance was encouraged. Pre-Bid Conference/Drawing Review Sign-in Sheets

Bidders must be pre-qualified for this package. Currently pre-qualified trade subcontractors for this package are:

  • Synergy Project Management
  • Trinet Construction
  • M. Hernandez Construction
  • J. Flores Construction
  • P&J Utility
  • Shaw Pipeline
  • Pacific Underground
  • Con-Quest Construction
  • Cal-State Constructors
  • M Squared Construction
  • Precision Engineering, Inc.
  • A. Ruiz Construction (added 1/5/11)
  • AZUL Works (added 1/13/11)

Bidders who are not pre-qualified may submit qualification packages to Webcor/Obayashi Joint Venture no later than 10 business days prior to the Bid Due Date. Bids from unqualified bidders at the time of bid opening will be returned unopened. Qualification application documents are posted below.

Funding for this work is provided by the American Recovery and Reinvestment Act (ARRA) Federal economic stimulus program; ARRA requirements include providing monthly jobs reports.

Attached Files No. of Files: 11
Click titles below to download
Bid Tabulation 31KB .pdf Posted 1/19/11
Addendum No. 1 Cover Letter (revised plans/specs available from Ford Graphics;
documents noted below as Rev A are from Addendum No. 1)
86KB .pdf Posted 1/5/11
Invitation for Bid Cover Letter 54KB .pdf Posted 12/7/10
Project Bidding Manual 209KB .pdf Posted 12/7/10
Exhibit A (Rev A) 8930KB .pdf Posted 1/5/11
Subcontract and Exhibits B through I 2968KB .pdf Posted 12/7/10
Plan Holders List 124KB .pdf Posted 1/10/11
Plan Room List 33KB .pdf Posted 12/7/10
Advertisement 15KB .pdf Posted 12/7/10
QUALIFICATION DOCUMENTS
Request for Qualifications 145KB .pdf Posted 12/7/10
Previous Q&A regarding Utility Relocation RFQ 26KB .pdf Posted 12/7/10

For notification of updates, contractors are encouraged to register on the TJPA’s website. However, all contractors are solely responsible for ensuring the receipt of any and all addenda, and should therefore check the website before submitting their Bids to ensure receipt of all addenda, and to ensure their bids respond to any such addenda.