Data Network and Systems Integration
Bid Type: | Construction |
Bid Number: | TG27.1 |
Bid Title: | Data Network and Systems Integration |
Bid Due Date: | Wednesday, August 17, 2016 |
Time Due: | 2:00 p.m. |
Estimated Value: | $11.5 million |
SBE Utilization Goal: | 15% |
Description: Webcor/Obayashi Joint Venture seeks responses to a Request for Qualifications (RFQ) and concurrent Invitation for Bids (IFB) from Trade Subcontractors interested in bidding the TG27.1 Data Network and Systems Integration Construction Services on the contract for the Transbay Transit Center (TTC) Project located in San Francisco, California. Bidders that have already pre-qualified do not need to respond to the RFQ.
Webcor/Obayashi Joint Venture seeks Trade Subcontractors that have significant experience with LAN/WAN, WiFi & Mobility, IP Telephony, Network Security, Terminal Servers, Network Implementation and equipment procurement and systems integration on complex projects which require significant coordination with adjacent properties and traffic relocation located in an urban environment; including the engineering, coordination, procurement and complete installation of their respective systems.
Bid Plans, Specifications, and reference documents for the Project may contain protected information pertaining to sensitive, financial, commercial, or proprietary business information and/or the security of the Project. Such protected information is classified as Confidential Information, Sensitive Security Information (SSI) or Protected Critical Infrastructure Information (PCII).
Bid Plans, Specifications, and reference documents containing protected information will be made available to Bidders on the TJPA’s secure website after they have signed and returned a completed Non-Disclosure Agreement (NDA) to the Transbay Joint Powers Authority (TJPA). In addition to submitting signed NDAs for each individual requesting access to protected information, each bidding firm must submit to the TJPA a list of all Designated Individuals in its organization who require access to protected information. Refer to the NDA Instructions, NDA Agreement, NDA Attachment, linked below, for detailed information and instructions.
Bid Plans and Specifications that do not contain protected information may be purchased via ARC – Northern California PlanWell, (415) 495-8700 or viewed and downloaded here. Other package documents, including the Project Bidding Manual, are posted below.
Use the following links to download the NDA Instructions, the NDA form, and the NDA attachment; an Excel template for the NDA Designated Individuals list; and a diagram showing how Bidders access SSI. Use the “upload” button below to submit signed NDAs and the completed NDA Designated Individuals list.
NDA Downloads | No. of Files: 3 | |
Click titles below to download | ||
NDA Instructions, NDA Agreement, NDA Attachment | 136KB .pdf | Posted 7/7/16 |
NDA List of Designated Individuals | 73KB .xls | Posted 7/7/16 |
How Bidders Access SSI | 65KB .pdf | Posted 7/7/16 |
A Pre-bid Conference for Trade Subcontractors interested in submitting bids was held on Tuesday, July 19, 2016, at 1:00 pm, at Webcor/Obayashi Joint Venture’s project office at 175 Beale Street, San Francisco, CA 94105. Attendance at the pre-bid conference was optional but highly encouraged. The presentation and sign-in sheets are available here: Pre-Bid Conference Sign-in Sheets | Pre-Bid Conference Presentation. Partial Pre-Bid Presentation (complete presentation available to bidders who have been granted access to the TJPA secure website).
If a Bidder is not pre-qualified, the Bidder shall submit one (1) original, four (4) copies, and one (1) electronic copy of their Qualification requirements in sealed envelopes addressed to: Webcor/Obayashi Joint Venture at 175 Beale Street, San Francisco, CA 94105 by 2:00 pm Pacific Time on Tuesday, July 19, 2016. Second-tier subcontractors do not need to respond to the RFQ. Trade Subcontractors will be notified of their qualification status by Monday, July 25, 2016. Bids submitted by non-qualified Bidders will not be accepted or opened. Non-qualified Bidders assume all risk and costs associated with submitting a bid if they are deemed not qualified. Qualification application documents are posted below.
Bidders must be qualified to bid this package. Currently the qualified bidders are:
- Cupertino Electric Inc.
- Fisk Electric Company
- NetXperts, Inc.
- World Wide Technology, Inc.
Pre-Qualified Bidders Contact List for TG27.1 (as of August 10, 2016)
Trade Subcontractors will be required to have second-tier subcontractors in order to meet the Small Business Enterprise (SBE) participation goals. Second-tier subcontractors do not need to respond to this RFQ, regardless of SBE status. An SBE is defined in the Transbay Joint Powers Authority (TJPA) Board Policy No. 15, Small Business Enterprise Program. The SBE utilization goal on this subcontract is 15%.
Trade Subcontractors are required to comply with all TJPA contract requirements, including signing a letter of assent to the Transbay Transit Center Project Labor Agreement (PLA) and certifying compliance with federal Buy America regulations. See Project Labor Agreement Web Page for PLA and Small and Disadvantaged Business Enterprise Frequently Asked Questions.
Each Trade Subcontractor shall submit sealed bids to the TJPA offices at 201 Mission Street, Suite 2100, San Francisco, California 94105 by 2:00 pm Pacific Time on Wednesday, August 17, 20165.
Attached Files | No. of Files: 17 | |
Click titles below to download | ||
TG27.1 Bid Tabulation | 18KB .docx | Posted 8/19/16 |
TG27.1 Questions & Answers Set Set #4 | 24KB .pdf | Posted 8/12/16 |
TG27.1 Questions & Answers Set Set #3 | 68KB .pdf | Posted 8/10/16 |
TG27.1 Questions & Answers Set Set #2 | 44KB .pdf | Posted 8/8/16 |
TG27.1 Questions & Answers Set Set #1 | 19KB .pdf | Posted 8/1/16 |
Editable QBD Form | 18KB .docx | Posted 7/7/16 |
Addendum #1 Cover Letter TG27.1 (Documents noted below as Addendum #1 are updated in this Addendum) | 146KB .pdf | Posted 8/12/16 |
Invitation For Bid Cover Letter TG27.1 | 183KB .pdf | Posted 7/7/16 |
Project Bidding Manual (Rev. 30, Dated March 13, 2015) | 847KB .pdf | Posted 7/7/16 |
Exhibit A TG27.1 (Addendum #1, August 12, 2016) | 114KB .pdf | Posted 8/12/16 |
Long Form Subcontract TG27.1 | 461KB .pdf | Posted 7/7/16 |
Exhibits B through P | 4,742KB .pdf | Posted 7/7/16 |
Plan Room List (as of July 7, 2016) | 165KB .pdf | Posted 7/7/16 |
Advertisement TG27.1 | 81KB .pdf | Posted 7/7/16 |
QUALIFICATION DOCUMENTS | ||
Questions and Answers Set (RFQ) TG27.1: Data Network and System Integration | 21 KB .pdf | 3/18/16 |
Request for Qualifications (RFQ) TG27.1: Data Network and System Integration | 462 KB .pdf | 3/2/16 |
TG27.1: Data Network and System Integration Advertisement | 11 KB .pdf | 3/2/16 |
Key IFB Dates | |
Bid Package Issued | Thursday, July 7, 2016 |
Pre-Bid Conference | Tuesday, July 19, 2016 (1:00 p.m.) |
Qualifications Due (for non-prequalified) | Tuesday, July 19, 2016 (2:00 p.m.) |
Notification of Qualification (for non-prequalified) | Monday, July 25, 2016 |
Questions/Clarifications (QBD) Due | Wednesday, August 3, 2016 (2:00 p.m.) |
Pre-bid Request for Substitution Due | Wednesday, August 3, 2016 (2:00 p.m.) |
Value Engineering (VE) Proposals Due | Wednesday, August 10, 2016 (2:00 p.m.) |
VE Proposals Review | August 10 – 17, 2016 |
Bids Due | Wednesday, August 17, 2016 (2:00 p.m.) |
Public Bid Opening | Wednesday, August 17, 2016, (2:00 p.m.) |
Protest Period Ends | Wednesday, August 24, 2016, (5:00 p.m.) |
Notification of Intention to Award Contract | Thursday, September 1, 2016 |
TJPA Board Vote to Approve Contract Award | Thursday, September 8, 2016 (September 2016 TJPA Board Meeting) |
For notification of updates, contractors are encouraged to register on the TJPA’s website. However, all contractors are solely responsible for ensuring the receipt of any and all addenda, questions on bid documents, applicable pre-construction RFIs and should therefore check the website before submitting their Qualifications and Bids to ensure receipt of all listed documents, and to ensure their qualififications and bids respond to any such documents.