Construction of Bus Storage Facility (RFQ)

Construction of Bus Storage Facility

The Transbay Joint Powers Authority (TJPA) issues this Request for Qualifications (RFQ) for CONSTRUCTION SERVICES FOR THE BUS STORAGE FACILITY, a component of the Transbay Transit Center Program (Program). The Bus Storage Facility will be constructed on the lot occupying the surface block underneath Interstate 80 between Perry, Stillman, Second, and Third streets in downtown San Francisco, CA.

The TJPA seeks Contractors that have significant experience on projects that are similar in size, complexity and value of the Bus Storage Facility. The scope of work for construction of the Bus Storage Facility will include the cost of all necessary labor, material, equipment, supplies, and supervision required to complete the work in accordance with the bid documents and should include, at a minimum, the following:

• Elevated concrete viaduct/bridges and foundations
• MSE (Mechanical Stabilized Earth) wall construction
• Mass excavation/grading/paving
• Retaining walls/sound walls
• Modular structures
• Work within the Caltrans Right of Way

All Contractors who wish to submit a bid for construction of the Bus Storage Facility must first be qualified by the TJPA. It is mandatory that Bidders provide all materials requested in the RFQ package. No bid will be accepted from a Contractor who has failed to comply with these requirements.

Questions or clarifications regarding the qualification forms must be submitted in writing no later than 2:00 pm Pacific time on Thursday, November 17, 2016, by e-mail to TJPA at BusStorageFacility@transbaycenter.org. No questions will be accepted after 2:00 pm on November 17, 2016. The answers to questions regarding this RFQ will be posted on the TJPA’s website by Tuesday, November 29, 2016.

Interested Contractors shall submit a Request for Qualification (RFQ) package no later than 2:00 p.m. Pacific time on Tuesday, December 6, 2016. Each Contractor shall submit one (1) original and four (4) copies, as well as one (1) electronic copy on a CD or USB Drive, of its response to this RFQ at the following address:

Transbay Joint Powers Authority
201 Mission Street, Suite 2100
San Francisco, CA 94105

Notification of the qualification will be provided to Contractors by Tuesday, December 13, 2016. Bids submitted by non-qualified Contractors will not be accepted or opened. Non-qualified Contractors assume all risk and costs associated with submitting a bid if they are deemed not qualified.

Under the RFQ process, the following firms were pre-qualified to bid the scope of work when contract documents are released:

  • Ghilotti Bros., Inc.
  • Ghilotti Construction Company, Inc.
  • McGuire and Hester
  • Shimmick Construction Company, Inc.

Pre-Qualified Bidders Contact Roster for 17-05 Construction of Bus Storage Facility (as of December 13, 2016)

Reponses to this RFQ that are not received by the time and date specified, do not contain all the required information and completed forms, or do not meet all minimum qualifications may be deemed non-responsive and rejected without consideration.

Download Documents No. of Files: 3
Document (Click to Download) File Size & Type Date Posted
RFQ 17-05: Construction of Bus Storage Facility Questions and Answers 25 KB .pdf 11/21/2016
RFQ 17-05: Construction of Bus Storage Facility 128KB .pdf 11/3/2016
RFQ 17-05: Electronically Fillable Attachments 1 through 7 111KB .docx 11/3/2016
Advertisement for RFQ 17-05: Construction of Bus Storage Facility 17KB .pdf 11/3/2016
Key RFQ Dates
RFQ Issued Thursday, November 3, 2016
Deadline for Submission of Questions Thursday, November 17, 2016, 2:00 p.m. Pacific Time
Answers to Written Questions Posted Tuesday, November 29, 2016
RFQ Packages Due Tuesday, December 6, 2016, 2:00 p.m. Pacific Time
Notification of Qualified Bidders Tuesday, December 13, 2016